Prepare for the Florida Building Code Practice Exam with our comprehensive quiz. Utilize flashcards and multiple-choice questions, each crafted with hints and explanations to help you succeed. Get ready to ace your exam!

Practice this question and more.


What inspection typically precedes the final inspection on a building under construction?

  1. Sheathing inspection

  2. Framing inspection

  3. Roofing inspection

  4. Drywall inspection

The correct answer is: Roofing inspection

The inspection that typically precedes the final inspection on a building under construction is the roofing inspection. This inspection is crucial because it ensures that the roofing elements are properly installed, watertight, and compliant with building codes, which is essential for the protection of the structure from water damage. Completing a thorough roofing inspection helps to identify any potential issues before the final checks are made, safeguarding the overall integrity of the building. In the context of construction, while sheathing, framing, and drywall inspections are important steps in the building process, they occur at different stages and do not come directly before the final inspection. The roofing inspection must be completed after the structure is framed and before the final inspection, making it a critical component in the progression toward completing a building project.